Skip To Main Content

Logo Image

Logo Title

Measure SM

About Measure SM

Many of the schools within the Bellflower Unified School District date back over 70 years, having been built in the mid-20th century. While these historic buildings have fostered countless educational experiences, they now face significant challenges in meeting modern safety standards, educational needs, and technological advancements. The aging infrastructure not only impacts the safety and comfort of our students and staff but also limits the types of programs and learning opportunities available to our students.

To address these needs, the Bellflower Unified School District Board of Education has voted to place a school facilities improvement bond measure on the November 3, 2026 General Election ballot. This proposed $135 million general obligation bond is designed to provide financing to improve our learning environments.

$135 milliongeneral obligation bond
Nov. 3, 2026General Election ballot
55%voter approval required to pass
$49per $100,000 of assessed value (highest estimated rate)

Goals of the Proposed Measure

The bond measure will provide funding for:

  • School Safety: Enhancing security systems, fencing, lighting, and emergency communication systems.
  • Classroom Repairs: Upgrading deteriorating roofs, restrooms, plumbing, HVAC systems, and other facilities.
  • Technology Upgrades: Equipping classrooms with modern technology.
  • Career Education Facilities: Creating and updating spaces for vocational and career education to prepare students for future careers.
  • Long-term Improvements: Supporting overall enhancements as identified in the District’s Facilities Master Plan.

Financial Impact

The estimated cost for property owners is $49 per $100,000 of assessed property value while bonds are outstanding.

Bellflower Unified Overivew

The Bellflower Unified School District serves students at 15 schools, focusing on:

  • College and career readiness
  • Dual language learning
  • Academic support programs

Commitment to Accountability

To ensure transparency, the proposed measure includes:

  • An independent citizens’ oversight committee
  • Annual audits and public reporting
  • Limitations ensuring that funds are used solely for voter-approved projects, and not for salaries or operating expenses.

Registered voters within the Bellflower Unified School District will have the opportunity to decide on this measure in November. To pass, the measure requires at least 55% approval from voters, as mandated by Proposition 39, Article XVIII A(1)(b)(3) of the California Constitution.

Bellflower Unified School District Unveils New Facilities Master Plan

The Bellflower Unified School District has announced the development of its 2026 Facilities Master Plan, aiming to create safe, modern, and student-centered facilities throughout the district. This long-range roadmap outlines priority investments to enhance safety and classroom environments, support spaces for students, infrastructure, and community-serving school facilities.

Spanning from 2026 to 2036, the Facilities Master Plan identifies the district’s needs and recommended improvements over the next decade. The plan focuses on school safety upgrades, classroom modernization, restroom improvements, HVAC enhancements, and indoor air quality upgrades. Additionally, it emphasizes technology infrastructure improvements and accessibility enhancements.

The plan also addresses the need for athletic and performing arts facilities, as well as outdoor shade and gathering areas that support college, career, and student wellness programs. This comprehensive approach reflects the district’s commitment to fostering a safe and enriching learning environment for current and future students.

For further information about the Bellflower Unified School District and the Facilities Master Plan, educational partners are encouraged to visit https://www.busdfmp.com/

Measure SM Informational Brochure

Measure SM: Planning for the Future — Improving Our Schools for Bellflower, Cerritos and Lakewood Students

View the printed mailer below. The full text of the brochure, follows the viewer so it can be read with a screen reader, enlarged, or translated.

Your browser can’t display the PDF here. Download the Measure SM Informational Brochure (PDF), or read the full brochure text below.

Download the brochure (PDF) Read the brochure text

Brochure text (accessible version)

Planning for the Future

Bellflower Unified School District is planning for the future

Dear Neighbor,

Bellflower Unified School District provides education from pre-kindergarten through grade 12 to approximately 9,300 students in Bellflower, Cerritos and Lakewood. Our mission is to build futures for students by providing pathways to become responsible, informed and productive citizens who can compete in a diverse world. Our schools provide students with opportunities to learn, grow and prepare for college, careers and community life.

Schools and Facilities in Need of Repair

Many BUSD schools and facilities were built decades ago and require updates to support safe, accessible and modern learning environments. The District’s facilities needs assessment identified work involving roofs, plumbing, heating, ventilation, electrical systems, classrooms, science labs, career training facilities, technology, safety and security, and accessibility.

Planning for the Future

The District has evaluated facility needs and aligned proposed projects with educational priorities. Measure SM would provide locally controlled funding for eligible school facility improvements identified in the Bond Project List. Projects would be implemented over time based on Board of Education priorities, available funding, final project costs and the availability of other sources, including potential State matching funds. Community input and careful planning will remain important as projects are evaluated and scheduled.

Erin M. Simon, Ed.D.
Superintendent, Bellflower Unified School District

2026 Measure SM: School Facilities Improvement Measure

To address identified facility needs, Measure SM would authorize the Bellflower Unified School District to issue up to $135 million in bonds, subject to voter approval by at least 55 percent. Bond proceeds could be used only for eligible school facilities projects listed in the measure, including construction, reconstruction, rehabilitation, replacement, furnishing and equipping of school facilities, and acquisition or lease of real property for school facilities.

Funding from Measure SM could be used to:
  • Repair, replace or modernize deteriorating roofs, leaking pipes, plumbing, sewer and gas lines, waterlines, storm drains, heating, cooling, ventilation and electrical systems
  • Modernize and renovate classrooms and school facilities, including flooring, ceilings, windows, doors, lighting, finishes, paint, furniture, storage, equipment and signage
  • Upgrade science labs, libraries, classrooms, makerspaces and facilities for college preparation, career training, music, dance, visual and performing arts
  • Improve instructional technology and technology infrastructure
  • Make Americans with Disabilities Act and other accessibility improvements, including walkways, parking, restrooms, drinking fountains, playgrounds, classrooms and facilities
  • Improve student safety and security through fencing, gates, intercoms, cameras, emergency communications, lighting, fire and life-safety systems and security monitoring
  • Repair or improve outdoor learning areas, landscaping, shade structures, seating, playgrounds, sports fields, gymnasiums, courts, locker rooms, cafeterias and kitchens
  • Replace or modernize outdated portable classrooms and improve sidewalks, parking lots, driveways, asphalt and concrete
  • Make seismic, termite, hazardous-materials and other health and safety improvements as needed
Fiscal Accountability Required

Measure SM includes taxpayer safeguards to help ensure bond funds are spent as authorized:

  • All bond funds must remain locally controlled for eligible BUSD school facilities projects and may not be diverted to other school districts
  • An independent Citizens’ Oversight Committee must be appointed within 60 days after the election results are entered in the Board’s official minutes
  • Annual independent performance audits must verify that bond proceeds are spent only on authorized projects
  • Annual independent financial audits must be conducted until all bond proceeds are spent
  • The Superintendent must provide an annual report to the Board on bond proceeds received and spent and the status of projects
  • Bond proceeds may not be used for teacher or administrator salaries, pensions or other school operating expenses

Measure SM is subject to official election materials and applicable legal requirements. Tax rates and debt-service estimates are projections and may vary.

Frequently Asked Questions

Bellflower Unified School District — November 2026 School Facilities Bond Measure SM

Bellflower Unified School District serves students and families in Bellflower and surrounding communities by providing educational programs that prepare students to become responsible, informed, productive citizens who can compete in a diverse world. The District’s schools support student learning in reading, math, science, engineering, arts, technology, and career preparation, while providing local students with the classrooms, labs, and school facilities they need to succeed.

What is the Bellflower Unified School District bond measure SM?

The Bellflower Unified School District Bond Measure SM is a local school facilities bond measure scheduled for the November 3, 2026, ballot. If approved by voters, the measure would authorize the District to issue up to $135 million in general obligation bonds to repair, modernize, furnish, equip, and improve school facilities throughout the District.

The measure is intended to provide locally controlled funding for specific school facility projects listed in the Bond Project List, including repairs to aging infrastructure, classroom and lab upgrades, student safety improvements, accessibility upgrades, and facilities supporting college and career preparation.

What vote is required for the measure to pass?

The measure requires approval from at least 55% of voters. A “YES” vote supports the District’s bond proposal. A “NO” vote rejects the proposal.

Why did Bellflower Unified School District place the measure on the ballot?

Many Bellflower Unified schools and buildings are more than 70 years old and require upgrades, repairs, and improvements to meet modern educational, safety, accessibility, and building standards. The School District has completed a facilities needs assessment and aligned facility priorities with its educational goals.

The District completed a districtwide facilities assessment that identified needs related to aging roofs, plumbing, sewer and gas lines, heating, cooling, ventilation, electrical systems, restrooms, classrooms, labs, safety systems, accessibility, technology, and college- and career-preparation facilities.

What is the ballot question voters will be asked to decide?

The adopted ballot measure label states:

“With funds that cannot be taken by the State and spent elsewhere, shall Bellflower Unified School District’s measure to repair/replace deteriorating roofs, plumbing, heating, ventilation and electrical systems; upgrade classrooms, labs and career training facilities; and, improve access for students with disabilities be adopted, authorizing $135 million in bonds levying $49 per $100,000 assessed value ($8 million annually) while outstanding, with legal rates, audits, citizen oversight, no funds for administrator salaries and full disclosure of all spending?”

How would bond funds be used?

If approved, bond funds would be used solely for school facility projects listed on the Bond Project List. These projects may include:

  • Repairing or replacing deteriorating roofs, leaking pipes, outdated plumbing, sewer and gas lines, waterlines, storm drains, heating, cooling, ventilation, and electrical systems
  • Upgrading labs, libraries, classrooms, and school facilities
  • Improving access for students with disabilities, including ADA upgrades to walkways, parking, restrooms, drinking fountains, playground equipment, classrooms, and facilities
  • Updating campus safety and security systems, including fencing, gates, intercoms, cameras, emergency communications, lighting, fire/life safety systems, and door locks
  • Renovating restrooms, drinking fountains, water bottle refill stations, water filtration systems, kitchens, cafeterias, eating areas, and serving areas
  • Removing or addressing hazardous materials identified before or during construction
  • Making health and safety improvements, including seismic reinforcements and repairs to aging or damaged facilities
  • Modernizing science labs, libraries, classrooms, makerspaces, and facilities for college preparation and career-training programs
  • Upgrading instructional technology and technology infrastructure
  • Improving classrooms and facilities for music, dance, visual arts, performing arts, science and technology
  • Repairing or improving playgrounds, play surfaces, sports fields, gymnasiums, courts, athletic facilities, locker rooms, sidewalks, parking lots, driveways, and walkways
  • Modernizing or replacing outdated portable classrooms and improving outdoor learning areas, shade structures, landscaping, and student meeting spaces

Accountability and taxpayer protections are required. Measure SM requires an independent Citizens’ Oversight Committee, annual independent financial audits, annual independent performance audits, public reporting to the Board, and full disclosure of bond spending. Bond funds must be spent only on projects listed in the Bond Project List and may not be used for teacher or administrator salaries, pensions, or other school operating expenses.

What would the measure cost?

The measure would authorize up to $135 million in bonds. The estimated average annual tax rate is $45.78 per $100,000 of assessed value, and the highest estimated tax rate is $49 per $100,000 of assessed value. Property taxes are based on assessed value, not market value.

When is Election Day and who can vote?

Election Day for the Bellflower Unified School District Bond Measure SM is Tuesday, November 3, 2026. A “YES” vote supports the District’s bond proposal; a “NO” vote rejects it. All registered voters living within the Bellflower Unified School District (including the communities of Bellflower, Cerritos, and Lakewood) will be eligible to vote on Measure SM. To pass, the measure must receive at least 55% approval from voters.

Provided for your information only as a public service by Bellflower Unified School District. Fall 2026.

Fact Sheet

Bellflower Unified School District — November 2026 School Facilities Bond Measure SM

Background

Bellflower Unified School District serves students and families in Bellflower and surrounding communities by providing educational programs that prepare students to become responsible, informed, productive citizens who can compete in a diverse world. The District’s schools support student learning in reading, math, science, engineering, arts, technology, and career preparation, while providing local students with the classrooms, labs, and school facilities they need to succeed.

However, many Bellflower Unified schools and buildings are more than 70 years old and require repairs, upgrades, and improvements to meet modern educational, safety, accessibility, and building standards. Aging classrooms, labs, roofs, plumbing, sewer and gas lines, heating, ventilation, electrical systems, restrooms, and campus safety systems require attention. The District has completed a facilities needs assessment and aligned facility priorities with its educational goals.

The State of California does not provide enough funding to meet all local school facility needs, and limited State facility dollars often require local matching funds. If approved by local voters, the Bellflower Unified School District bond measure would authorize up to $135 million in locally controlled bond funds to repair, modernize, equip, furnish, and improve school facilities. These funds would benefit only Bellflower Unified schools and could not be taken by the State or other school districts.

If approved by local voters, Measure SM would benefit Bellflower Unified School District by:

  • Repairing or replacing deteriorating roofs, leaking pipes, outdated plumbing, sewer and gas lines, waterlines, storm drains, heating, cooling, ventilation, and electrical systems
  • Upgrading labs, libraries, classrooms, and school facilities
  • Improving access for students with disabilities, including ADA upgrades to walkways, parking, restrooms, drinking fountains, playground equipment, classrooms, and facilities
  • Updating campus safety and security systems, including fencing, gates, intercoms, cameras, emergency communications, lighting, fire/life safety systems, and door locks
  • Renovating restrooms, drinking fountains, water bottle refill stations, water filtration systems, kitchens, cafeterias, eating areas, and serving areas
  • Removing or addressing hazardous materials identified before or during construction
  • Making health and safety improvements, including seismic reinforcements and repairs to aging or damaged facilities
  • Modernizing science labs, libraries, classrooms, makerspaces, and facilities for college preparation and career-training programs
  • Upgrading instructional technology and technology infrastructure
  • Improving classrooms and facilities for music, dance, visual arts, performing arts, science and technology
  • Repairing or improving playgrounds, play surfaces, sports fields, gymnasiums, courts, athletic facilities, locker rooms, sidewalks, parking lots, driveways, and walkways
  • Modernizing or replacing outdated portable classrooms and improving outdoor learning areas, shade structures, landscaping, and student meeting spaces

Accountability and taxpayer protections are required. Measure SM requires an independent Citizens’ Oversight Committee, annual independent financial audits, annual independent performance audits, public reporting to the Board, and full disclosure of bond spending. Bond funds must be spent only on projects listed in the Bond Project List and may not be used for teacher or administrator salaries, pensions, or other school operating expenses.

The measure would authorize up to $135 million in bonds. The estimated average annual tax rate is $45.78 per $100,000 of assessed value, and the highest estimated tax rate is $49 per $100,000 of assessed value. Property taxes are based on assessed value, not market value.

Election Day for the Bellflower Unified School District Bond Measure SM is Tuesday, November 3, 2026. A “YES” vote supports the District’s bond proposal; a “NO” vote rejects it. All registered voters living within the Bellflower Unified School District (including the communities of Bellflower, Cerritos, and Lakewood) will be eligible to vote on Measure SM. To pass, the measure must receive at least 55% approval from voters.

Provided for your information only as a public service by Bellflower Unified School District. Fall 2026.

News Articles About the Measure

Video

Watch this video on YouTube

Contact

Phone
562-866-9011 Ext. 2110
Email
communications@busd.k12.ca.us
Address
16703 S. Clark Ave
Bellflower, CA 90706